Developer: Groupe Germain, Homes by Avi
Architect: LEMAYMICHAUD Architecture Design
  
Address: Confluence Way and 6 Avenue SE, Calgary
Category: Residential (Hotel), Commercial (Retail)
Status: CompleteCompletion: 2018
Height: ? ft / ? mStoreys: 11 storeys
Project Forum 359 posts
Real Estate Forum
Follow 2 followingUpload 138 photos
Official WebsiteReport Error


ALT Hotel | ?m | 11s | Groupe Germain | LEMAYMICHAUD

General rating for this project

  • Great

    Votes: 4 10.5%
  • Very Good

    Votes: 10 26.3%
  • Good

    Votes: 19 50.0%
  • So So

    Votes: 3 7.9%
  • Not Very Good

    Votes: 2 5.3%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    38
So apparently this is going to utilize modular construction, with pods already done and ready to be put into place on site. I'd guess there has to be some steel framing done first for the pods to be put into.

I saw two pods on site this morning.

I googled Alt Hotel and another was built with modules in St John's. Looks like the steel framing is incorporated in the modules.

http://www.marcogroup.ca/projects/alt-hotel/

The one here is twice as tall. Should be an awesome site to see built.
 
I've got some pics of the modules going in which I'll post later today, also there will be a video some time later. It was quite cool watching them put them in. :cool:
 
Why are the windows different sizes?

Looks like that center one has a higher ceiling, but weird that they wouldn't line mullions up horizontally and have an extra or taller pane at the bottom.
 
Last edited:

Back
Top