maestro
Senior Member
So apparently this is going to utilize modular construction, with pods already done and ready to be put into place on site. I'd guess there has to be some steel framing done first for the pods to be put into.
I saw two pods on site this morning.
I googled Alt Hotel and another was built with modules in St John's. Looks like the steel framing is incorporated in the modules.
http://www.marcogroup.ca/projects/alt-hotel/
The one here is twice as tall. Should be an awesome site to see built.