Residence Inn by Marriott | 127.10m | 36s | GWL | IBI Group

General rating for this project

  • Great

    Votes: 2 4.4%
  • Very Good

    Votes: 19 42.2%
  • Good

    Votes: 20 44.4%
  • So So

    Votes: 4 8.9%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    45
April 10

twitterapr2.jpg
 

Attachments

  • twitterapr2.jpg
    twitterapr2.jpg
    363.5 KB · Views: 694
Love seeing towers get built on the north side of 10th & the south side of 9th to fill in the wasteland on either side of the tracks.
 
Hi All,
I Remember Years Ago You Couldn't get anyone to Dvlpe/Bld along 10th Ave if You Tried. The only one Between 8th St - East and 4th St - West was M E C.
The Others were just Sites from Yrs Back and that was It, I remember reading that the Belt Lime had Over 2 Billion in Dvlpmt Projects etc Yrs Back. The
Drepression Hit and a Lot Just Seemed to Dry Up. Its Now 2018 (May) and a Lot has Changed Between 1st St S E and 14th St S W. it Will B Interesting to See
how the Belt Line Looks in 3 to 5 Yrs Time.
Tnx,
Operater.
 
These boys turned out great.
 

Back
Top