First and foremost, The Marriott needs a floor plan that compliments a future plus 15 connection. Does anyone know what is planned for the second floor? Is it lobby retail or part of the conference centre?
Because it's in the Beltline, there's no requirement for it, so probably not. I would be happy not to have a +15.Hi Group,
Here is a Question. What are the Chances of this Project getting into the Plus 15 System at some point in time? The only way I see It happening is Via the Place 10 Project
but I'm Not sure of Its Status at the Moment.
Tnx,
Operater.
First and foremost, The Marriott needs a floor plan that compliments a future plus 15 connection. Does anyone know what is planned for the second floor? Is it lobby retail or part of the conference centre?
Also over the CPR tracks would require a +30 or +45 connection, so integration with the existing system would be difficult. I am happy if the Beltline remains +15 free. Its a short and nice walk into the core from 10th Avenue along 5th Street.
Hi Group,
I see the Hotel Side is starting to take shape. Give it say 6 months and it will start getting a Positive Feel on the Overall. Its Good that the Rental Tower is starting to get some Shape as well. I figure in about 6 Months We will start getting some Positive Vibes as to how this Tower will look. Hope it Translates into more Dvlpmnts on the
10th Ave Corridor in time.
Tnx,
Operater.