This project is quite odd so far.
Agreed. It's not like anything I've ever seen before.This project is quite odd so far.
The only other one I know of is the ALT Hotel in St John's that was just completed.It's the first pre-fabricated high-rise ever built in Alberta, possibly all of western Canada, maybe even the entire country as I'm drawing a blank on any others right now... so that is to be expected. It should seem quite odd.
This must be the first high rise for sure then, as the construction manager for the site said this was only the second in Canada where the whole floors were modular.The keyword in my post being "high-rise", the one in St. John's is like 3 or 4 floors. High-rise starts at 10 for commercial buildings/hotels and 12 for residential
However, that would be pretty wild if this was only the second pre-fab modular construct in all of Canada, of any size. Wow.
It'll save on time for sure, but cost maybe not. From what I've read, the modular construction isn't cheaper, but the fact that they save 6-8 months of construction time, it might be cheaper in the long run.Hi Group,
If this is All Correct about Preblt etc, Guess We find out if it Saves on Time & Money Later I Guess.