General Construction Updates

Eau Claire Plaza and the bridge supports:
20211125_115652.jpg
20211125_115658.jpg
20211125_115714.jpg
20211125_115708.jpg
 
Last edited:
The bridge doesn't look like it will be much wider than the one it is replacing. I thought that was a main goal of this project. Maybe it's just an illusion based off the photos?
It's going from 3.8m to 5.9m; the north bridge to the park is 3m, and the Peace bridge is 6.2m. I might have gone a little wider, but it's still a substantial improvement. It'll still be busy on Canada Day and Folk Fest, but the other 360 days (and the other 22 hours on those days) it'll be fine.
 
The first of 4 sections of the arches for Inglewood Bridge are being lifted into place…

0551C108-57DF-47A8-A828-049FF74EA55D.jpeg
BAA8A62B-C69B-49D9-A6DE-AFF1F01DE2E6.jpeg
B8244AC7-93A6-456D-B4F7-4BE2CCB74CBB.jpeg
 