darwink
Senior Member
The main issue is this, and that the deep bit of silt and clay is right at where the tunnel is supposed to run:So I tried looking at a lot of the thread but 60 pages of reading could take a long time. So is funding the main delay right now or are there any other significant issues? I'm always fascinated with LRT construction regardless of what city it is in.
This is causing risk allocation issues, which in turn is causing a funding issue, because of the need for contingencies upon contingencies with the contracting strategy the city chose.