Not sure what they are doing on the overpass next to the site.

2017-08-01 13.07.54.jpg
 

Attachments

  • 2017-08-01 13.05.38.jpg
    2017-08-01 13.05.38.jpg
    2.7 MB · Views: 379
  • 2017-08-01 13.06.52.jpg
    2017-08-01 13.06.52.jpg
    2.4 MB · Views: 396
  • 2017-08-01 13.07.54.jpg
    2017-08-01 13.07.54.jpg
    2.1 MB · Views: 437
The photo tells a different story. The ramp is being widened.


Could be a new sidewalk or for two way traffic (should the parking garage entrance be on that side?)
 
The parking garage and loading dock entrances are all on the side facing the flyover.
 
The personal vehicle entrance is on 6th Ave. Loading/garbage is off of 5th Ave. I believe it is a larger sidewalk, and a better connection down the slope to the sidewalk on the 5th Ave flyover.
 
Looks like it will be a two-way ramp, and a lane is being removed from 3rd street (presumably as part of the CMLC 3rd street improvements):
...

This and few other small projects shown on the City's site including two-way traffic between Baines Bridge and 12th St NE Bridge, and an extra through lane on WB 6th Ave @ 11th SW:
http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Traffic-improvement-projects.aspx

Nice find! These must be the cheaper improvements that the City was talking about a year or two ago.
 
I like this configuration much better. Thanks for posting.
Looks like it will be a two-way ramp, and a lane is being removed from 3rd street (presumably as part of the CMLC 3rd street improvements):
TOI-5-ave-at-3-st-se.jpg



This and few other small projects shown on the City's site including two-way traffic between Baines Bridge and 12th St NE Bridge, and an extra through lane on WB 6th Ave @ 11th SW:
http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Traffic-improvement-projects.aspx
 
I passed by that intersection yesterday and they already have the little triangle traffic island that goes between the green and blue lines (shown in picture) in place. So this road must be opening soon?
 