ALT Hotel | ?m | 11s | Groupe Germain | LEMAYMICHAUD

General rating for this project

  • Great

    Votes: 4 10.8%
  • Very Good

    Votes: 9 24.3%
  • Good

    Votes: 19 51.4%
  • So So

    Votes: 3 8.1%
  • Not Very Good

    Votes: 2 5.4%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    37

Operater

Active Member
Member Bio
Joined
Feb 4, 2017
Messages
751
Reaction score
82
Hi,
It will B Two Weeks till the Labour Day Wkd. I will B Interested to See how the (nterior will Look Like. Hope Its as Good as the Outside - if not Better.

Tnx,
Operater.
 

Stephen Ave

Active Member
Member Bio
Joined
Dec 16, 2017
Messages
248
Reaction score
331
I had a chance to check this one out in person yesterday, and I love it. Now we just need M2 to get built.
 

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
2,662
Reaction score
4,873
Location
Capitol Hill
I really love how this turned out. Really cool. The extremely white M2 Block is going to create a really cool contrast.
 

Mountain Man

Senior Member
Member Bio
Joined
Mar 9, 2017
Messages
1,343
Reaction score
1,192
The black contrasts all the white in the area so nicely! was skeptical when I saw the renders, and the modular look in construction looked pretty rough, but the finished product looks great!
 

AJX

Active Member
Member Bio
Joined
Oct 1, 2016
Messages
622
Reaction score
382
Location
Calgary
The black contrasts all the white in the area so nicely! was skeptical when I saw the renders, and the modular look in construction looked pretty rough, but the finished product looks great!
It looks good, better than the rendering made it look. I've seen the ALT in Winnipeg and Halifax and they both look like shit, and going by the renderings I thought this might turn out the same.
 

DiscoStu

Active Member
Member Bio
Joined
Apr 13, 2016
Messages
252
Reaction score
325
Cool building for sure. I wish the signage facing the river was back lit glass or something, instead of just solid panels. It cheapens the building a bit this way.
 

Top