News   Apr 03, 2020
 4.8K     1 
News   Apr 02, 2020
 6.7K     3 
News   Apr 02, 2020
 3.9K     0 

General Construction Updates

When you look at the proposed designation, it is DC/MU-2f5h32. That means it is a Direct Control (special rules for that specific site) zoning based on the standard MU-2 district. The "f" afterwards indicates the maximum FAR, and the "h" indicates the maximum height, in meters.


Oh right, I knew that at one point, totally slipped my mind. Thanks!
 
314797E3-C62E-43E3-A1D3-C2CF1EADA6EE.jpeg
I’ve never heard of this development but it’s already under construction on Edmonton Trail and 27th ave NE.
 

Attachments

  • 314797E3-C62E-43E3-A1D3-C2CF1EADA6EE.jpeg
    314797E3-C62E-43E3-A1D3-C2CF1EADA6EE.jpeg
    128.9 KB · Views: 557
Looks pretty substantial. Nice to see :)
 
Mawlid Al-Nabi Mubarak!

Merry Christmas!

Happy Hanukkah!
 
Macleod Trail site, called Macleod professional centre.
CCE744EA-C045-4EA9-A911-0CEA7D7FDE30.jpeg
 

Attachments

  • CCE744EA-C045-4EA9-A911-0CEA7D7FDE30.jpeg
    CCE744EA-C045-4EA9-A911-0CEA7D7FDE30.jpeg
    152.6 KB · Views: 315

Back
Top