News   Apr 03, 2020
 4.6K     1 
News   Apr 02, 2020
 6.5K     3 
News   Apr 02, 2020
 3.7K     0 

Crane Count

Forgot about the two cranes at Residence Inn. I also forgot about the Cancer Centre coming online...that should be at least three cranes I would think.
 
Given the size of the cancer centre, I'm thinking 3 cranes at least. Might be a while before the count gets below 20.

Yeah, it's hard to say.

I'm guessing that these will be down by the end of summer 2018:

Quarry Crossing North: 1
Marriot 10th Avenue SW: 2
Lumino: 1
Park Point: 1
Radius Bridgeland: 1
Gateway West Springs: 1
Emerald Sky Condos(Kincora): 1
Skyview Condos: 1
Bonnybrook Waste Treatment plant: 1
Ink East Village: 1

Total: 11

These may possibly be down by end of summer:
Rio Can East Village: 3
Verve East Village: 1

Total: 15
 
Getting below 20 is a sure thing IMO. Probably around end of summer. Less than 20 seems disastrous, yet outside of the big three metros, any other city would be happy with 20 cranes.
 
64A58A54-C743-4CA3-AEC1-1B15A72764F3.jpeg
One goes up and one goes down. Marriott is down to one crane now.
 

Attachments

  • 64A58A54-C743-4CA3-AEC1-1B15A72764F3.jpeg
    64A58A54-C743-4CA3-AEC1-1B15A72764F3.jpeg
    210.2 KB · Views: 301
I was coming here to break the news about the Marriott crane, but was beaten to the punch. The crane count is going to start dropping over the next 4-6 months, but at least we have a few more on the horizon.

-one more for West Village towers
-500 block no doubt
-maybe Rhapsody?
-Brentwood Village
- 2 or 3 for the cancer centre.
 

Back
Top