Developer: Embassy Bosa, First Capital
Architect: Abugov Kaspar
  
Address: 16 Avenue SW & 8 Street SW , Calgary
Category: Residential, Commercial (Retail)
Status: CompleteCompletion: 2018
Height: 377 ft / 114.90 mStoreys: 34 storeys
Project Forum 797 posts
Real Estate Forum
Follow 4 followingUpload 501 photos
Official WebsiteReport Error


The Royal | 114.9m | 34s | Embassy Bosa | Abugov Kaspar

General rating for this project

  • Great

    Votes: 23 33.8%
  • Very Good

    Votes: 33 48.5%
  • Good

    Votes: 9 13.2%
  • So So

    Votes: 3 4.4%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    68
Canadian Tire has not backed out. Store is on track to open this fall. I’m the planner for this location.

Woooooot! Amaaaaaazing, thanks for the info dude :D
 
Canadian Tire has not backed out. Store is on track to open this fall. I’m the planner for this location.

Yes! Why did I hear from the sales lady at the Royal that Canadian Tire backed out - was there some kind of momentary backing out and now you guys are back in?
 
I read somewhere that this is nearing its final height.
Really?
It looks like it still has a while to go, no?

Great pics tho GoVertical, I haven't followed this one extensively so I didn't even know the balconies were gonna be spaced around like that. I like it :)
 
Last edited:
I read somewhere that this is nearing its final height.
Really?
It looks like it still has a while to go, no?

Great pics tho GoVertical, I haven't followed this one extensively so I didn't even know the (balconies?) were gonna be spaced around like that. I like it :)

It definitely has a while to go. Last I counted (last week) it was at ~25 stories, and it's final height is 34 stories.
 
I think what the writer meant to say in that post is that from here on in, it wont be much longer until it gets topped off, assuming a floor a week is done with no delays. Still 2 months away at least.
 
Hi All,
If Cdn Tire is Still Going In?, what floor space will they B Taking? It was my Understanding it would B the 2nd Flr. Could B wrong if Its Grd Flr.

Tnx,
Operater,
 
I really like the look of the raw concrete and glass right now. It's a shame it will all be cladded over. Still, she's a beaut. I can't wait till both it at Park Point are done to judge the final products.
 

Back
Top