Developer: CSEC
Architect: HOK, DIALOG
  
Address: Olympic Way SE, Calgary
Category: Institutional
Status: ConstructionCrane(s): 0
Height: 121 ft / 36.85 mStoreys: 11 storeys
Project Forum 3.6K posts
Real Estate Forum
Follow 2 followingUpload 443 photos
Official WebsiteReport Error


Scotia Place | 36.85m | 11s | CSEC | HOK

Do you support the proposal for the new arena?

  • Yes

    Votes: 108 68.4%
  • No

    Votes: 40 25.3%
  • Maybe

    Votes: 10 6.3%

  • Total voters
    158
Murray Edwards walked away from $10M in cost increases and we now have a deal for $1.25B!? What in the actual fuck. Our supposedly conservative Premier is kicking in $300M for demolition of the saddledome.
I was on board with the Mayor and City walking away from the deal after Edwards tried to strong arm us into paying for what CSEC had agreed to, but now we are effectively paying the total cost of the original arena design. Seriously, we look like giant fools.
 
Murray Edwards walked away from $10M in cost increases and we now have a deal for $1.25B!? What in the actual fuck. Our supposedly conservative Premier is kicking in $300M for demolition of the saddledome.
They didn’t walk away because of that, it is plainly clear.
 

Back
Top