Developer: Calgary Public Library, Calgary Municipal Land Corporation
Architect: Snøhetta
  
Address: 3 Street SE and 7 Avenue SE, Calgary
Category: Institutional
Status: CompleteCompletion: 2018
Height: ? ft / ? mStoreys: 6 storeys
Project Forum 747 posts
Real Estate Forum
Follow 3 followingUpload 412 photos
Official WebsiteReport Error


New Central Library | ?m | 6s | Calgary Library | Snøhetta

General rating of the project

  • Great

    Votes: 53 72.6%
  • Very Good

    Votes: 16 21.9%
  • Good

    Votes: 4 5.5%
  • So so

    Votes: 0 0.0%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    73
I think so. I'm not thrilled by the cladding even with the recent addition of more glass. Perhaps my expectations were too high. It's not going to break my impression of the building. The form, layout and public interface is more than enough to make up for my disappointment with the panelized cladding.
 
I keep flip-flopping on my opinion of the cladding being panelized. I do think it looks great, but could have been better. On one hand, it could have had all the irregular shapes been a solid piece each and could still potentially have "panelized" it this way in clusters. Then on the other hand, the renders themselves show it being built exactly how it has been, in rectangular panels.
 
Hi Group,
Hard to Believe that this Area was Just a Waist Land a few Yrs back. Interesting How the Librairy Itself has Turned Out,'
Tnx.
Operater
 
Holy hell that looks wicked :)
 
It looks good in that lighting. It's funny, I thought the LRT cables would be a detractor, but they look kinds funky against the library.
 
I think it's coming together nicely. Once they take away that little overhang piece over the lrt tracks, it'll look even better.
 
Hi Group.
Not Sure, Could B Wrong on this but I believe that over hang stays for the time being Will See in a few months time I guess.
Tnx,
Operater.
 
No, lol. It's a temporary structure only there to protect trains from potential falling construction debris. It will be removed when construction is complete... per the renders.
 

Back
Top