Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

General rating of the project

  • Great

    Votes: 9 9.6%
  • Very good

    Votes: 45 47.9%
  • Good

    Votes: 29 30.9%
  • So So

    Votes: 7 7.4%
  • Not Very Good

    Votes: 3 3.2%
  • Terrible

    Votes: 1 1.1%

  • Total voters
    94
The tower doesn't look too bad. According to their website the building will feature an indoor pool. Not too sure where in the building it's located but definitely a nice novelty as pools seem to be a rarity in Calgary rental buildings.

The folks who live there now, have it great with the building only partly occupied.
 
Stopped in at the Superstore at East Village, nice place to shop.
7887F47E-038A-469C-9A06-7F70437754D9.jpeg
9EE047B0-A399-4C4B-9629-72AADFABEAEC.jpeg
 
CMLC gave their shareholder update to Council today. As part of that update they made it sound like construction of the second tower is imminent. Definitely a pleasant surprise and with that kind of timing my guess is it will also be rentals.

That's awesome news!

Right on top of a grocery store and a liquor store. 2 minutes to the river pathway, or the library. Pretty sweet location in a lot of ways.
 
CMLC gave their shareholder update to Council today. As part of that update they made it sound like construction of the second tower is imminent. Definitely a pleasant surprise and with that kind of timing my guess is it will also be rentals.

That's lit news🔥 Hopefully some design or material changes on the 2nd tower? This first tower was good but subpar based on BOSA's standards.
 

Back
Top