News   Apr 03, 2020
 6.3K     1 
News   Apr 02, 2020
 7.9K     4 
News   Apr 02, 2020
 4.7K     0 

Urban Development and Proposals Discussion

Oh frick! Another 10-year conversion incoming.


  • Barron Building (610 8th Ave. SW, Calgary) – Targeting Spring 2026 completion with 124 high end rentals;
  • One01 (101 6th Ave. SW, Calgary) – The former Hanover office tower in downtown Calgary has been renamed and will have 314 residential suites with expected occupancy in November
I was looking at Chevron Plaza and I assume they're going to need to replace all the glazing. I wonder if they'll go for a reflective look like it has now.
 
Their permits should be contingent on finishing the Barron building!
Looks like the second storey on the penthouse structure could be complete. Could start to see the exterior coming together soon, maybe occupancy by next summer?
 
Last edited:
I was looking at Chevron Plaza and I assume they're going to need to replace all the glazing. I wonder if they'll go for a reflective look like it has now.
From a different time:
IMG_5438.jpeg
 
The ground floor of Chevron is really different than almost anything I can think of. Curious to see how/if it evolves for the conversion. I walk by Hanover a couple times a week and with the residential units finishing up, the ground level is still pretty well untouched.
 

Back
Top