The amount of work they've done is amazing. They've now installed most of the framework for the outer shell, and swan mall looks like its almost ready to get the topsoil put back on.

IMG_9442.JPG
IMG_9444.JPG
fullsizeoutput_1773.jpeg
 

Attachments

darwink

Senior Member
Member Bio
Joined
Oct 7, 2016
Messages
1,422
Reaction score
2,323
A neat thing is the internal windows have what looks to be an operable panel so people can get out to work on the install of the outer glass, and all the equipment that could be between the layers of glass.

Edit:
You can really see this here. Also with this and other photos we see glass on all four sides. The internal glass is to provide a comfortable environment inside. The outer glass, at one point they were thinking about installing solar PV in-between the facades, and of course the use of solar passive heating in limited amounts, so it is very permeable to radiation. It will be interesting to see what that type on glass, the outer facade, will actually look like, given that most of the time cooling will be more important than heating, perhaps except for higher floors to create a solar chimey to passively circulate air between the facades.
upload_2018-10-4_9-8-6.png
 

Attachments

Last edited:

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
3,385
Reaction score
7,838
Location
Mission
They are well into installing the support structure for the exterior glass layer. Very cool.

IMG_0168.JPG

fullsizeoutput_1ac4.jpeg

fullsizeoutput_1ac3.jpeg
 

Attachments

Last edited:

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
3,385
Reaction score
7,838
Location
Mission
Not exactly a construction update, but you can definitely see the 2nd additional floor has been completed.

fullsizeoutput_1bec.jpeg
 

Attachments

darwink

Senior Member
Member Bio
Joined
Oct 7, 2016
Messages
1,422
Reaction score
2,323

Attachments

darwink

Senior Member
Member Bio
Joined
Oct 7, 2016
Messages
1,422
Reaction score
2,323
I saw drywall and steel studs being delivered to site today, and rebar yesterday. Such a different mix we only usually see in the really big towers!
 

Surrealplaces

Administrator
Staff member
Member Bio
Joined
Sep 24, 2015
Messages
7,799
Reaction score
20,721
Location
Calgary
I like that there is still going to be an extra bit of visible height to this when it's finished. The building is already more noticeable from other parts of the city.
 