West District | ?m | ?s | Truman

A big photo update. I was away for a bunch of August so hadn't been through the site for over a month. Lots of progress.

First up is Radio Park itself. I have heard it will informally be open by the fall, with the official ribbon cutting in spring. Based on the progress, I can see that happening:
1724699061867.png

1724699100664.png

1724699123985.png



The steel beams for the roof of Radio Block are now starting to go up, you can get a sense of the curvature of it. I think this is going to be a pretty unique and cool building, situated right on the park!
1724699199324.png

1724699218394.png

1724699235925.png


The Quarters is not quite topped out yet, and it looks like we will start to see glass on the ground floor pretty soon:
1724699286988.png

1724699306408.png


Adelaide's parkade is starting to take shape:
1724699371326.png


A few buildings in District Townhomes still need to be finished, but they are also putting in the final landscaping for some of the earlier ones. I anticipate we will start seeing occupancy in a month or two:
1724699439568.png

1724699462787.png


The final buildings of Trico's West83rd Townhomes Phase 1 are underway. Occupancy has taken place with some of the other buildings, others are getting close:
1724699590663.png

1724699612731.png


The 8 Single Family Homes on the west side that Trico is building are all up to their full exterior shape, but still in various states of finishing:
1724699656821.png

Here is the smaller park in the SW corner of the community that Trico provided as part of their portion:
1724699698850.png
 
Second post, as the first had too many pictures in is:

Mondrian's west building is nearly complete, showing the much more tan look than the whtie renderings would suggest:
1724700534142.png

1724700552188.png


Plaza's west building looks to be topped out, with the east starting to rise. Also, the architectural supports for the actual "plaza" are waiting in the stating area to be installed:
1724700990791.png


The excavation for Oak & Olive is well underway, but not quite finished. Still no foundation work yet from what I could see:
1724701065725.png


The medium format grocery store (now confirmed as a Sobeys) has also progressed quite a bit, including the retail that will front onto Broadcast Avenue:
1724701125378.png

1724701144712.png
 
Awesome update @MichaelS !

I wonder if the new Sobeys will ultimate close the Sobeys over in Strathcona? It's really not that far apart. 85th Street continues to build it's weird suburban main street out. Very interesting corridor to watch.
 
Awesome update @MichaelS !

I wonder if the new Sobeys will ultimate close the Sobeys over in Strathcona? It's really not that far apart. 85th Street continues to build it's weird suburban main street out. Very interesting corridor to watch.
I doubt it - Petro Canada just decided to build a bigger gas station with an A&W across the street from the Strathcona Sobeys. I gotta think that Sobeys business case is stronger than competing so close with the No Frills and Co-op
 
Awesome update @MichaelS !

I wonder if the new Sobeys will ultimate close the Sobeys over in Strathcona? It's really not that far apart. 85th Street continues to build it's weird suburban main street out. Very interesting corridor to watch.
Like many areas which had 2 Sobeys one might change into a Freshco.
 
Another month has passed since my last photo update, so I went for a walk at lunch today:
Radio Park is really coming along, lots of progress. Final top soil and landscaping/planting was underway, some of the playground has been installed, proper signage. No animal scultpures yet. Also, the extension of 8A Avenue west is being constructed:

1728081667432.png


1728081689747.png

This is an artificial turf, I think there are supposed to be some sports courts or other uses in this part:
1728081806891.png

Not quite the finishing touches on the north side just yet:
1728081841706.png

1728081865513.png

1728081890043.png

1728081909266.png

1728081929312.png


Radio Block, the commercial building fronting the park, has its full steel structure up now by the looks of it:
1728081974283.png

1728081998235.png

1728082017687.png


Glass instalation has started on The Quarters, with the lower 2 levels in by the looks of it:
1728082066284.png

1728082082743.png


And the parkade for Adelaide is rising up from down under (sorry, couldn't resist the bad joke on a Friday afternoon):
1728082114246.png


District Townhomes are nearly complete, with some having occupancy already. Just finishing up landscaping and some interior work by the looks of it:
1728082312772.png


More to come in second post.
 
Some other District Towhome photos:
1728082394894.png


Trico's West 83rd first phase has the last 3 townhome buildings under construction:
1728082439300.png

The finished ones fronting 8A Avenue SW:
1728082466724.png


Utility work and site prep is starting for the West 83rd Townhomes Phase 2:
1728082509077.png


The 8 single family homes on the south side of 8A Avenue are getting close to completion. Driveways will be poured soon by the looks of it:
1728082555651.png


Mondrian's first building is getting closer and closer to finished, second one is not far behind:
1728082595531.png


Plaza's west building has glass going in on the ground floor:
1728082629852.png

The east building of Plaza will probably start rising quickly now that the formwork is on the typical floor plan. You can see the sculpture/structure elements for the central plaza in this shot, waiting to be installed:
1728082693226.png


Oak & Olive's parkade is still being excavated (it is pretty big by the looks of it):
1728082743440.png


And the medium format grocery store is also getting closer to completion, with some of the facade materials being installed for the CRUs that front Broadcast Avenue:
1728082790486.png


1728082818210.png
 

Back
Top