The Forge | 16.5m | 6s | Kanas | Gibbs Gage

This is an installation problem. The installers didn't have the experience or the time to do it right. It's screwed too tight not allowing for expansion at the seams

The white column breaks up the massing. I still would have preferred two separate mid rises or to save on elevators and emergency egress just a connecting hallway between both halves.
 
1000007654.jpg

Even like the look of its alley.
 

Back
Top