The Bridge | 52.42m | 16s | Jemm Properties | Zeidler

IMG_20200606_1450527.jpg
 
They are MOVING on this one. Damn.
 
Good lord. They are MOVING!
 
So that was definitely the installed crane base I saw yesterday because driving by on Memorial I saw that the crane is going up today.
 
I feel like this is a trick. It must be holograms and in reality it’s still just a brownfield. 😂

This is moving so damn fast!
 
I feel like this is a trick. It must be holograms and in reality it’s still just a brownfield. 😂

This is moving so damn fast!

This gives me a lot of hope for JEMM's Sunnyside project on 9A street. They started with an aggressive land use application to get significant parking relaxations, as with the Bridge. If it keeps on trend with this one, they will follow it up with a solid DP and a quick construction timeline that takes advantage of limited u/g parking.
 

Back
Top