Residence Inn by Marriott | 127.10m | 36s | GWL | IBI Group

General rating for this project

  • Great

    Votes: 2 4.4%
  • Very Good

    Votes: 19 42.2%
  • Good

    Votes: 20 44.4%
  • So So

    Votes: 4 8.9%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    45

Surrealplaces

Administrator
Staff member
Member Bio
Joined
Sep 24, 2015
Messages
13,467
Reaction score
79,682
Location
Calgary
The Development permit has already been approved, and the developer has already applied for a Building permit. There has been some activity on the site.


2015 Nov 6 089.JPG
2015 Nov 6 087.JPG
 

Attachments

  • 2015 Nov 6 089.JPG
    2015 Nov 6 089.JPG
    978.5 KB · Views: 1,535
  • 2015 Nov 6 087.JPG
    2015 Nov 6 087.JPG
    1.1 MB · Views: 1,505
It would be totally awesome to see them break ground on this baby :cool:. What's the ETA?
 
It would be totally awesome to see them break ground on this baby :cool:. What's the ETA?
I haven't heard a date or that they are for sure going ahead, but given that they have applied for a building permit, it's likely that they will go ahead and that it won't be too far off. Also the construction fencing and workers on site probably means a demolition is on the way.
 
They are seriously going ahead with this? That's awesome but surprising.
I don't think the hotel portion is surprising. I'm not sure if the residential rental tower is going ahead or not....it would be a bit surprising if it did, but I've been surprised a fair bit lately.
 
So it looks like they are going ahead with this. IMO projects like this are so important for downtown Calgary. Those empty lots around the tracks need to be filled up.
 
I went past this site today and there action. Not a lot mind you but st least something happening. Across the street at sixth and 10th it was really busy
 
It seems like they are moving fast on this one.
I like the splashes of colour. Hopefully that spandrel will look fine.
 

Back
Top