Imperia | 95.3m | 27s | Truman | NORR

They might be 🤷🏻‍♂️ 😁

5EE5BEBA-1E8E-469C-9862-16905509211F.jpeg
A3439463-DF1E-49FB-AADE-CF660CDDE75B.jpeg
 
I'd say that this is pretty strong evidence that they are now moving forward. I really don't know what else they'd be doing there?

If Imperia is indeed now moving forward with construction, I promise to stop whining about the lack of highrise construction in Calgary for the rest of the year.
 
Last edited:
You’d think if DP was approved and all the units were sold then as soon as BP was approved they’d start? Truman does have a “LOT” of projects under construction but this one seems to be a lock
There’s actually a level of construction you can start even without a BP. Long as the DP is approved I’m pretty sure shoring and excavation can begin. Stoked to see this one go up. It’ll be dwarfed by its neighbours but I think it’ll turn out great.
 

Back
Top