Architect: DIALOG
  
Address: 130 9 Ave SE, Calgary
Category: Institutional
Status: ConstructionCrane(s): 0
Height: 141 ft / 43.00 mStoreys: 9 storeys
Project Forum 295 posts
Real Estate Forum
Follow 2 followingUpload 146 photos
Official WebsiteReport Error


Glenbow Museum | 43m | 9s | DIALOG

So I’m assuming the glass that is supposed to be curvy at the top corner of the building will not be transparent? Looks like there is interior walls already set up. That’s disappointing.
 
So I’m assuming the glass that is supposed to be curvy at the top corner of the building will not be transparent? Looks like there is interior walls already set up. That’s disappointing.
Hard to say. They likely have backing up so they can progress the interior work without water getting in while the window is finished...
 

Back
Top