Architect: DIALOG
  
Address: 130 9 Ave SE, Calgary
Category: Institutional
Status: ConstructionCrane(s): 0
Height: 141 ft / 43.00 mStoreys: 9 storeys
Project Forum 295 posts
Real Estate Forum
Follow 2 followingUpload 146 photos
Official WebsiteReport Error


Glenbow Museum | 43m | 9s | DIALOG

It should reopen once the external work is done. Everything interior can be done through the loading bay.
 
It should reopen once the external work is done. Everything interior can be done through the loading bay.
This is Calgary though. The exterior will be 99.99999% complete but the sidewalk will remain closed for 8 more months because the building still needs a single piece of trim.
 

Back
Top