This has turned out better than I expected. What a cool looking building.
Late 2026When are the renos supposed to be complete?
Hopefully they can re-open the sidewalk on 1 Street SE once exterior work is done. It's a very busy pedestrian area and not a nice road to have to cross back and forth on.Externally it's planned to be completed sometime this year. Internally work continues into late 2026
This is Calgary though. The exterior will be 99.99999% complete but the sidewalk will remain closed for 8 more months because the building still needs a single piece of trim.It should reopen once the external work is done. Everything interior can be done through the loading bay.