Should have posted this here instead of General Construction Updates. Demolition is happening.

12Ave.png


Credit: @harry_the_historian on Instagram
 
There is a fence around the eastern part of the property. All the buildings are gone except the one on the SE corner. The remaining one has a demolition permit posted.

The western half of the property, which was basically a gravel lot, is unfenced. However, there are barriers preventing cars from entering, except for a small gap in the alley.

IMG_2089.jpeg


IMG_2114.jpeg


IMG_2175.jpeg


IMG_2221.jpeg


IMG_2247.jpeg
 
My theory is, if they take the Fitness Centre down, we will likely see this one go ahead sooner than later.
 