BMO Centre Expansion | ?m | ?s | CMLC

Da_Master

Active Member
Member Bio
Joined
May 13, 2017
Messages
210
Reaction score
950
Today’s update. All pictures taken this morning.
9636BA20-4580-4080-BF16-0E3A666E7D54.jpeg
835F5A46-9A03-4485-B356-0D761E4596D8.jpeg
80CCC95A-F9E0-4563-A3FD-92A27E76F689.jpeg
FDF351A9-CA72-4CEF-A516-D37CA42DD633.jpeg
D7FCBC16-29C6-4985-87D2-1F0CC95D3C65.jpeg
20CA19B8-FE5A-40E4-88D4-D40DA993F949.jpeg
59E7CE82-80AD-473B-8E58-2832F46BF080.jpeg
042C6425-3FC2-41AD-A80B-5B4D6CE5185B.jpeg
DFF19E08-5E26-4AA0-8DD7-0B0A2C0A4276.jpeg
15526E87-7122-4800-B49A-A1B6E8E9BECD.jpeg
AA904622-9A39-49F7-9F67-853A68975FB9.jpeg
9AE5E949-B141-4702-96DB-6CD123462FC2.jpeg
4B25DF95-037E-40CA-BBD9-59F6ED72BEB0.jpeg
0139EA9C-5083-45E1-B3C9-EE9050C8A47A.jpeg
8BA4B385-BE37-490A-971D-3D818AAA5894.jpeg
 

darwink

Senior Member
Member Bio
Joined
Oct 7, 2016
Messages
1,636
Reaction score
2,883
Probably related to building a temporary CTrain platform to allow the existing Victoria Park station to be demolished.
Or support facilities for field hospital or shelter space. Or temporary facilities to enable as much of the BMO to stay active while expanding.
 

Cyric

Active Member
Member Bio
Joined
Oct 24, 2016
Messages
291
Reaction score
1,170
That is a temporary shelter for the new utility complex that is being built as part of the changes to the Victoria Park station. Easier to see from the BMO centre side of the tracks but they have finished their excavation and shoring. You can see the building on the plans here:
8E31F9EA-4714-4DEF-8B74-40FD3825D388_1_201_a.jpeg
 

Rollerstud98

Active Member
Member Bio
Joined
Jul 8, 2017
Messages
348
Reaction score
479
Would it hurt the casino to repaint it’s roof?!
It's not a painted roof. White membrane that accumulates dirt and other materials. What you see there is where the water pools around the roof drains. Not worth the money to go out there and clean it off for the sake of people who may be able to look down upon it from above to have a cleaner view lol.
 

Top