1901 College | 16m | 5s | Truman

7F78A3AF-0F1F-446B-8041-8D1A5C198AE2.jpeg
4D95EA4A-41FA-494B-AEFE-DFE4D6849B43.jpeg


reminds me i was by there a few days ago, seemed like they were doing some controlled demolition on one of the houses on the site.

huge improvement!

.
 
Let's hope so. Lately the process seems to be, tear down buildings and clear trees, let site for two years, drill some piles, let sit for a year, excavate and build. Once topped out, let the exterior sit covered in Tyvek for a year.
That's only happened like twice recently, and neither were by this developer. Truman is easily the most reliable multi-residential developer in the region.
 
Truman don't sit on things, if they have a permit they will act on it.
That's only happened like twice recently, and neither were by this developer. Truman is easily the most reliable multi-residential developer in the region.
Truman is reliable, and I have no doubt they’ll build this but don’t forget they sat in West 17 and Archer after demo for a while before going ahead. Also the sand with West 33 which has been idle for a year since demo happened. We also have the 3 sites on 24th Ave that were bulldozed and have been idle for a year. They will get built, but I don’t think it’s unusual to see sites for a year before something happens.
 

Back
Top