B badc0ffee Senior Member Staff member Member Bio Joined Feb 9, 2023 Messages 1,213 Reaction score 4,785 Location Calgary Sep 8, 2025 #76 DP2025-04907 is public now.
T Travisty Active Member Member Bio Joined Jun 5, 2019 Messages 114 Reaction score 884 Sep 8, 2025 #77 I cant find the project, but this block with the old Dominoes has already been demolished. https://maps.app.goo.gl/zv3UJdp8w2CnvzFg9
I cant find the project, but this block with the old Dominoes has already been demolished. https://maps.app.goo.gl/zv3UJdp8w2CnvzFg9
Mountain Man Senior Member Member Bio Joined Mar 9, 2017 Messages 6,789 Reaction score 20,638 Location Calgary Sep 10, 2025 #78 Existing building is now a pile of rubble.
manshakesfistatcloud New Member Member Bio Joined Apr 6, 2024 Messages 39 Reaction score 283 Sep 10, 2025 #79 Wow! I didn't know that this building existed. I've been in the CBE building across the street a few times.
Wow! I didn't know that this building existed. I've been in the CBE building across the street a few times.
Surrealplaces Administrator Staff member Member Bio Joined Sep 24, 2015 Messages 14,507 Reaction score 87,002 Location Calgary Sep 10, 2025 #80 Would be great if this gets going.
Spring2008 Active Member Member Bio Joined Feb 20, 2016 Messages 316 Reaction score 2,823 Location Calgary Wednesday at 2:58 PM #81 Almost thought this was a pile driver, but good to see progress regardless.