Developer: ONE Properties
Architect: Gibbs Gage Architects, MG2
  
Address: 110 12 Ave Southwest, Calgary
Category: Residential, Commercial (Retail)
Status: Pre-ConstructionCompletion: TBD
Height: 387 ft / 118.00 mStoreys: 36 storeys
Project Forum 218 posts
Real Estate Forum
Follow 2 followingUpload 94 photos
Official WebsiteReport Error


Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

Albertasaurus

Active Member
Member Bio
Joined
Oct 26, 2023
Messages
810
Reaction score
4,244
We seem to finally be seeing a crop of new towers moving forward, or at least being proposed. I hear there's a plan to redevelop the TransAlta bldg site by demolishing most of the main building and replacing it with a 35-ish floor tower. I think it's One Properties doing that one. Also a pair of 25-ish floor towers planned for Heritage Station area by the London towers. These will be formal applications soon, if they aren't already.

Christmas is coming a little early this year
 
I hear there's a plan to redevelop the TransAlta bldg site by demolishing most of the main building and replacing it with a 35-ish floor tower.
The one on 11th and Centre? I know it's not the friendliest building from a pedestrian realm, but I always kind of liked the architecture of that building. It looks like it should house NASA or some 80s tech company.
 
Yeah that's the one. I'm with you - I sort of like that building too. But if it'll get rid of a couple hundred thousand SF of office space while adding a few hundred new residents to the area, I consider it a win. Certainly better than what we ended up with at 17th and 4th, ie a gravel lot for how many years.
 
Yeah, I get it, some more residents will be a nice add.

I know lots aren't interchangeable, but sure would be nice if the big-ass parking lot across the street was developed first before demolishing any existing buildings though.
 
It is really weird what they are doing to the TransAlta building but I'm sure they have their reasons. I quite like the tower design, even with the postmodern podium.

I wonder if this will have a future phase on the balance of the lot? There seems to be room for at least one more tower SE of this one.
 
I wonder if they're maintaining a partially demolished building T2 to retain parking underneath it?
 
With this TransAlta building coming down. I see why Preistly Demolition made the big investment moving all the equipment from back east. They have lots of work going on and lined up in the future
Currently doing
-old YWCA
-old Lilydale plant
Future sites?
-TransAlta?
-partial demolition of Future Kenten Project?
-old CBE building?
Anything else they might be doing?
 

Back
Top