5seconds
New Member
I'm not sure. The Sarcee/Richmond interchange came after a study of that entire corridor and this was the portion that the City felt would make the greatest impact on dealing with the downstream traffic generated by the ring road. The Bow interchange was studied along with this one, and this interchange (with some minor improvements to Bow) was selected as the most bang for the buck.