FCC1982 Senior Member Member Bio Joined Sep 5, 2017 Messages 1,286 Reaction score 3,427 Today at 12:49 PM #7,921 Is it the Green Line vehicle storage facility ?
whatchyyc Active Member Member Bio Joined May 5, 2021 Messages 937 Reaction score 9,168 Today at 1:10 PM #7,922 O-tac said: Much larger excavation occurring than I first realized at 130th Ave beside the PBS building. Earth moving happening the entire length along Deerfoot. Anyone know next phase design or have access to a DP? Click to expand... Only thing I've seen is a DP for the roads:
O-tac said: Much larger excavation occurring than I first realized at 130th Ave beside the PBS building. Earth moving happening the entire length along Deerfoot. Anyone know next phase design or have access to a DP? Click to expand... Only thing I've seen is a DP for the roads:
O-tac Senior Member Member Bio Joined Mar 14, 2018 Messages 1,151 Reaction score 3,557 Location Laval's basement Today at 1:22 PM #7,923 Those roads are already built. Someone who seemed to work at PBS commented about a year ago that a second phase was coming. This is the land west of the Canadian Tire, not north of 126th ave, so it’s definitely not the train storage facility.
Those roads are already built. Someone who seemed to work at PBS commented about a year ago that a second phase was coming. This is the land west of the Canadian Tire, not north of 126th ave, so it’s definitely not the train storage facility.