The Hub | ?m | 28s | Campus Suites | ARK Inc.

General Rating for this project

  • Great

    Votes: 2 3.2%
  • Very Good

    Votes: 4 6.3%
  • Good

    Votes: 28 44.4%
  • So So

    Votes: 7 11.1%
  • Not Very Good

    Votes: 10 15.9%
  • Terrible

    Votes: 12 19.0%

  • Total voters
    63
Definitely on the tower portion, and visible from 16th ave.

IMG_3689.JPG
IMG_3690.JPG
IMG_3691.JPG
 
Agree, going by the rendering I would say the brick wall ends right where it is now.
I had the exact same thought. Looking at the renders, I think that brick wall will be hidden, and is the location where the main tower connects to the 3 story podium that will extend to the South.
 
Some new info on this one. I'd be interested to hear anyone's input.

Fly-by Video Rendering (includes ultimate 16th Ave upgrade build-out):
https://youtu.be/XHvRFZUJkyI


Some notable design changes:
- Two stories removed from tower and height reduced accordingly.
- Podium height increased from 12.5m to 14m (due to construction type change from concrete slabs to steel beams).
- Podium rooftop patio removed due to neighboring community privacy and noise concerns. Will become just a mechanical space.
- Amenity space / fitness centre moved from forth floor to top floor.
- Large main floor restaurant and patio seating to be replaced by four smaller fast food style restaurants with outdoor seating on the East side of the building.
 

Back
Top