Pretty typical of Concord. Dig a hole as soon as possible and then wait many months for permits or whatever to begin construction. I wouldn't bet anything on the starting price either. This is a large piece of property with not too many units. I'd just keep my fingers crossed. Concord goes full board on design but, usual cheaps on the finishes.


With a starting price at like 1.4 million I'm sure it will be very high quality materials. I went by today and snapped a picture, the pit is completely leveled out but there's no sign of a crane base which is weird.
25637916174_ba085400e1_b.jpg
 
The pit is still empty, but activity is close. The GC is from Vancouver and they are lining up local contractors, expect to see activity in about 3 weeks.

2016 June 2 178.JPG 2016 June 2 180.JPG
 

Attachments

  • 2016 June 2 178.JPG
    2016 June 2 178.JPG
    2.7 MB · Views: 517
  • 2016 June 2 180.JPG
    2016 June 2 180.JPG
    2.8 MB · Views: 469
That's really great news. I was worried that this one got put on hold!
 
I was worried about that too. It's one thing to have a construction pit on hold somewhere like 10th ave, but it's another when it's right on the river pathway.
 
The crane base has being installed !

image.jpeg
image.jpeg
 

Attachments

  • image.jpeg
    image.jpeg
    2.7 MB · Views: 835
  • image.jpeg
    image.jpeg
    1.8 MB · Views: 545