Developer: Giustini Development Corporation, Assured Communities Ltd., Centurion Asset Management
Architect: Sturgess Architecture
  
Address: 918 McPherson Square Northeast, Calgary
Category: Residential
Status: CompleteCompletion: TBD
Height: 59 ft / 18.00 mStoreys: 6 storeys
Project Forum 310 posts
Real Estate Forum
Follow 0 followingUpload 168 photos
Official WebsiteReport Error


Steps Bridgeland | 18m | 6s | Giustini Development | Sturgess

General rating of the project

  • Great

    Votes: 11 28.9%
  • Very Good

    Votes: 18 47.4%
  • Good

    Votes: 6 15.8%
  • So So

    Votes: 0 0.0%
  • Not Very Good

    Votes: 3 7.9%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    38
What a great update Surreal. The brickwork looks fantastic. If there's one thing that is bugging me it's the column diameter at the corner units. I'm wondering if they could have been a little more slender, given that it appears they have moved to steel structure above it.
 
Gross that looks bad. That really drops this project down a couple notches. The brick is excellent and they go and ruin the look with those cheap panels.
 
I think the colors are okay. What is neutral and can go with charcoal brick, and the red is a decent enough accent to the brick as well. My concern would be how the panels look in a few years, after seeing what has happened with those types of panels at other sites. In some cases they've faded severely - I don't know if it's related to the brand, or the material in general.
 

Back
Top