SAIT Campus Centre | 24m | 5s | SAIT | GEC

Which sucks as it could have helped fill the void left by the Eau Claire Y closing...
 
The seating for the basketball courts appears to be a bleacher (you can briefly see another court underneath) so if they have a big sport event they can add an additional bleacher to the other side, doubling the capacity
 
I think I caught it in the video, but the building is still connected by a bridge to the LRT station right? Or are we having an at-grade LRT crossing?
 
I think I caught it in the video, but the building is still connected by a bridge to the LRT station right? Or are we having an at-grade LRT crossing?
Yes a new bridge will be built:
1733214130441.png


I remember it being there in the DP as well
 
Is there no gym/fitness Center with weights? Did I miss it?
Around 1:04 when it's panning towards the track/basketball gym there's an open area where a female is lunging/stretching. I interpret that to be the fitness centre - or at least part of it; sans weights in the render.
 
Last edited:

Back
Top