Place 800 | 68m | 17s | Peoplefirst

place 800
IMG_5880.jpeg
 
I wonder what they're doing to the elevator that they decided to add an external one. Anyone in the biz who can speak to why they'd do that?
 
The interior elevators are quite small and inadequate to load all the numerous building materials ( drywall, metal stud, windows, plumbing etc etc). They are very difficult to access, just much easier from exterior skip. Unsure if they may also upgrade the interior elevators as well.
 
Completed ----
Sierra Place
Cornerstone
Teck Place
Eau Claire I
Element Hotel
Cube

U/C ----
Hannover
Barron
Eau Claire II
Place 800
Dominion
PetroFina

There's probably some missing from the list.
The Teck Place conversion is still under construction. The webpage lists it as coming soon and no details on the floor plans or pricing have been released yet.

Edit: Looks like The Loft was literally just completed today as well lol
 

Back
Top