Park Central | 134m | 39s | Hines | S.C.B.

General rating of the project

  • Great

    Votes: 25 25.8%
  • Very Good

    Votes: 53 54.6%
  • Good

    Votes: 14 14.4%
  • So So

    Votes: 4 4.1%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 1 1.0%

  • Total voters
    97
Quick, everyone take a walk down 4th street the sidewalks are now open. I've lived/worked in the area for 15 years and I can only think of one other time when it was possible to walk from DT to Elbow, so take your chance now before the Truman site begins and inevitably closes the sidewalks on all sides.
Looking forward to the additional density that this will bring but man I just want to see the area look completed with no construction 😂
 
IMG_1042.jpeg
IMG_1040.jpeg
IMG_1041.jpeg
IMG_1039.jpeg
 
Would be nicer if it was more pedestrian focused. This looks like a pick up/ drop off area for phase 2 and servicing for phase 1. The pedestrian entrance off 4th should have the grand entrance with this drop off area being a hole in the wall.
 

Back
Top