Marc and Mada | 62m | 19s | Truman | NORR

I'm trying to think if they could be trying to increase visibility of the project and do a temporary experience centre until the new year? 33rd and 34th aren't a holiday shopping destination but maybe even a small increase in knowledge of the project will help.

As for a place off site that could host an experience centre, their options are pretty limited in the area. Directly across 33rd there is the now vacant circle k but that's all I can think of for vacancies in the area.
 
Feels like all those other lots along 33rd where developers are quick to evict and/or tear down and then get cold feet when it's time to build.
 
1000033434.jpg
 
Tower 1 is the shortest. Interesting that the tallest tower would be phase 3. Makes me think that there could be a chance that not all the towers would be built. If they are built sequentially that's a decade of construction, which is brutal to imagine.
 
Is this the first Truman project that's been kind of scaled back? can understand not doing all 3 in the current environment, but thought they'd at least do the first two concurrently.
 
Buliding this in phases with the podium and much of the landscaping done after phase 1 feels more palatable in a neighbourhood where the construction never ends. Which seems counterintuitive as it will actually take longer to build as a whole.
 

Back
Top