Canadian 001
Active Member
Quite the 6 months for High Rise Starts
Beltline Block might be possibilityI think that’s it for now in the belt line (remember something maybe over by the stampede on 17th). Marc and Mada in Marda loop looks impressive too
I can only think of 6.Wow, that’s 7 towers that have broken ground in Beltline/Beltline adjacent in the past year.
Fancesco’sI can only think of 6.
Sovereign
Nest
Yellowstone
Imperia
Galleria
Lincoln
6 in the last 6 months is still great.
I was thinking that too. I wonder if they got some kind of "volume discount" from some of their contractors with these 3 towers starting up nearly all at once.I don't think I realized just how close this build is to the Imperia. Maybe by having so many starts at the same time Truman is able to make more efficient use of equipment and resources given that the projects are kicking off around the same time? The Gallery isn't far off either.
It’s actually pretty smart the way they’ve done it. Guys do the shoring on one, then move to next one and so on. Then dig the pit on first, then move onto second and so on. Gotta be a cost savings on thatI was thinking that too. I wonder if they got some kind of "volume discount" from some of their contractors with these 3 towers starting up nearly all at once.
Yep, was including FrancesoFancesco’s
526-4th (not really Beltline but still a hi-rise)
9 including Kensington (Kit at Kensington)Yep, was including Franceso
Really if use the term 'Core' (Beltline/Beltline Adjacent/DT), we're looking at 8 highrises breaking ground in the last 6 months. Quite the run.
About the appeal phase - looks like that ended in August.
I don't think Kit is under construction yet, it's still in demolition phase no?9 including Kensington (Kit at Kensington)