INK | 53.03m | 14s | Battistella | S2 Architecture

General rating of the project

  • Great

    Votes: 8 27.6%
  • Good

    Votes: 16 55.2%
  • So So

    Votes: 3 10.3%
  • Not Very Good

    Votes: 2 6.9%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    29
It's actually not plywood. It's OSB. The INK coloured paint is also a water resistant sealer.
 
The hoist will be erected to the very top when the time comes.
 
Hi All,

If they are at the 9th FL now I figure by Yrs end they should B up to Close to say the 12th Fl and the top sometime in January 2018.
Just Rough Guessing for Now.

Tnx,
Operater
 
20171210_113526_resized.jpg
20171210_113715_resized.jpg
 

Attachments

  • 20171210_113526_resized.jpg
    20171210_113526_resized.jpg
    233.2 KB · Views: 240
  • 20171210_113715_resized.jpg
    20171210_113715_resized.jpg
    272.4 KB · Views: 239
Hi Group,
Just wondering how Sales or Rentals are doing now that they are Closer to the Top.

Tnx,
Operater.
 
Hi Again,
I will B Most Interested to see what their next Dvlpmnt will B - if there is One in the D T or Beltline Areas.

Tnx,
Operater
 

Back
Top