They're way off of it. All of them. The bootlickers who want a pat on the heard from Danielle, the fearmongers who think they just turned Calgary into Gotham. Thankful this is an election year.
We're really lacking leadership, it has shown time and time again. Someone to standup, be a champion of the facts and someone with some optimism. This is an opportunity. They're so naive to think the tunnel was a sure thing, it could've doubled in price easily and the city still would've been on the hook.
A design opportunity. I hope the professionals on the City's Green Line team see it as a way to do the best they can. I actually trust the bureaucracy a lot more than the elected officials, in this case the institution isn't the issue. And they actually have the previous, narrow, mandate out of the way.
I gotta disagree with the bolded - admin is the only constant through this whole saga, including several of the most senior folks.
Carra, Demong, and noted rapist Sean Chu are the only councillors who did all three terms (and all three voted in favour of these latest motions) . A bunch of councillors did 2/3, including Pootmans and Chabot who skipped the middle term. Nine of the current councillors are in their first term.
Let's remember what a small sliver of their job the GL actually is. I count 31 items on the agenda for that Jan 28, 2025 council meeting (excluding the regular formalities). All of us here spend more time thinking about this than they do. The GL should probably be the largest single sliver of them all given the expense, but it's still gotta be less than 1% of their time. And even if some of them are transit nerds who like to dig in like we do, the outcome of that is to ask admin questions and maybe offer some informal/generalized guidance, apart from the actual motions (which require majority support).
Woolley made at least one attempt for a major re-evaluation, but he couldn't get support for his motion (which is a failure of council to be sure, but I'd argue that is essentially council putting their faith in administration)...a lot of quotes in there that have aged poorly:
His proposal comes one week after the Green Line team said they arrived at a “key pivot point” and that they were no longer interested in a
“really deep” four-kilometre underground tunnel traversing the downtown.
Woolley wants city administration to review the Green Line’s effect on Calgary’s economic recovery, the location of the 4th Street S.E. station, a more cost-effective maintenance facility at Shepard or Aurora, and reducing station costs, among other considerations.
He also wants an independent third party to review and make recommendations, if needed, on the operating costs associated with current and future ridership and the strategy of splitting Stage 1 into two contracts.
However, Woolley’s proposal has been met with criticism.
Coun. Shane Keating said pausing the project will cost the city money and prevent jobless Calgarians from getting to work.
“Being able to move with (the first) contract allows local companies to put together a consortium to bid on the contract . . . it allows them to put their bids in immediately and put people to work in less than a year,” said Keating.
“Now, that makes more sense to me than saying we can’t do a thing until we figure out exactly what is going to happen in the core.”
5.5 years later, it turns out that we can’t in fact do a thing until we figure out exactly what is going to happen in the core.
Similarly, Mayor Naheed Nenshi said while Woolley’s motion is well-intentioned, it is ultimately misguided.
“Pausing for the sake of pausing means inflation, it means the cost goes up and it implies that these very important questions are not already being dealt with,” said Nenshi.
“We’re not spending four and half billion dollars without dealing with these questions, and certainly they are questions that council and administration have been grappling with for a long time.”
Apparently we got up to $6.2B without really dealing with theoe questions...
Interestingly, it actually looks like Woolley never brought forward his [apparently futile], but instead worked with Keating and the rest of the transpo committee to incorporate what he wanted into motions that could actually pass at the July 29, 2019 general meeting of council. A few notable council directions:
2. Direct Administration not to proceed with construction of the Green Line Light
Rail Transit Project – Contract #1 (4th Street SE to Shepard SE) until the
alignment review from 16th Ave North to 4th Street SE has been completed and
any potential changes have been approved by Council
a bunch of other points directing admin to thoroughly review things and try not to suck
7. Direct Administration to work with our funding partners to obtain agreement
that any capital cost savings from the Green Line Stage 1 (16 Ave N to 126 Ave
SE) project will be applied to the required land assembly, corridor preparation,
and design and construction of extensions north and south (outside the Stage 1
project), with sequencing of the extensions to be determined utilizing the
RouteAhead Project Prioritization Framework;
I'd need to dig deeper here, but this indicates to me that council still thought stage 1 could come in under budget. This was all initiated when admin ditched the deep tunnel under river and instead do a bridge across the Bow into another tunnel through the bluff. And it seems they gave council the impression that this could leave them with money left over!
8. Direct Administration to initiate land assembly on an opportunity basis north of
16 Ave North, for Green Line future stages utilizing the Transportation Future
Land Fund or the Revolving Fund for General Land Purchases, as a funding
source; and
9. Direct Administration to develop a scoping study to examine opportunities for
improvements to interim rapid transit services from North Pointe south along the
Centre Street corridor and report back to the SPC on Transportation and Transit
by Q1 2020. The scoping study will identify the next steps required to deliver
functional planning, preliminary and detailed designs;
I believe all of the above passed unanimously, but this one passed 7-6:
3. Direct Administration to conduct a feasibility review of potentially including the
North Pointe to 16th Ave corridor along Centre Street in Stage 1 if the 16th Ave to
4th Street corridor is not resolved by January 2020, to be included only once
confirmed with our funding partners;
So council was at least [barely] willing to dip a toe into the waters of pivoting to the north (which was understandably a long shot for a variety of reasons). Admin (and subsequently the GLB) like to play the 'council would need to direct us to explore other ideas' card, but their hands haven't always been as tied as they claim.
It's administration who spend months dedicated to the project between every report and recommendation to council. Of course there is some back/forth in developing the mandates, but admin is generally steering the ship. Council moves on to other matters, and admin has the opportunity to shape the narrative a few months down the road when they report back.
That's a long meandering post and I'm not exactly sure of my point (I just find it interesting to look back at some of these "key pivot points" now with the benefit of hindsight), but I think it's that even when council exercises prudent governance, they are reliant on admin to follow through.