Dominion | 53m | 15s | Bucci Developments | Urban Agency

General Consensus of the Project

  • Great

    Votes: 41 82.0%
  • Very Good

    Votes: 8 16.0%
  • Good

    Votes: 1 2.0%
  • So-So

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    50

dazzlingdave88

Active Member
Member Bio
Joined
May 1, 2016
Messages
234
Reaction score
726
There's a continuing care facility proposed for the parcel east of Radius. It's probably going to get built soon, and that is the last of "the Bridges" parcels if I'm not mistaken.
I think the Care facility is two parcels east of Radius. The long narrow parcel with all of the staging material for Dominion is the last one with no plans for Bridgeland I think.
 

BKha

Active Member
Member Bio
Joined
Mar 25, 2016
Messages
714
Reaction score
784
They are taking a while with the light gray panels. I hope this isn’t another West Village Towers type issue and they had to change suppliers
 

Surrealplaces

Administrator
Staff member
Member Bio
Joined
Sep 24, 2015
Messages
8,620
Reaction score
26,303
Location
Calgary
This building is so photogenic

07621C56-C4FC-4431-9806-5FAF7F8359A7.jpeg
60E9C0D0-2AA5-4503-9938-9E693B271CA6.jpeg
B519A38C-0449-40A0-A0BF-008C7B5A1B09.jpeg
40DA47BD-01E3-4B8A-91AC-3EB30025B18E.jpeg
A631A45C-60DE-45A6-9FEC-D5980E434DC6.jpeg
5AED758E-9F71-4F95-B9B5-A1BD3000AF63.jpeg
4C1938F6-2886-4DE8-B0AC-B72AA87FC3E4.jpeg
 

outoftheice

Active Member
Member Bio
Joined
Aug 19, 2017
Messages
264
Reaction score
1,013
Does anyone know what those blank concrete walls on the tower portion are going to end up as? Stucco? Brick?
 

Top