BLVD Beltline | 118.87m | 37s | ONE Properties | Arquitectonica

20180823_174455_resized.jpg

Site is all fenced off now and some equipment arrived on site in the afternoon, that last building isn't long for this world.
 

Attachments

  • 20180823_174455_resized.jpg
    20180823_174455_resized.jpg
    280 KB · Views: 691
Hi,
Week to Go B 4 Labour Day Wkd, Sounds Like these Sites are Getting ready to Start Work right after Labour Day, Summer must B Over as Such.

Tnx,
Operater.
 
Hi,
Passing thoughts. B Interesting if the Land between 12/Macleod down to say17/Macleod were to Qualify as T O D. I wonder if it would have an Impact on
Developement in the Areas.

Tnx,
Operater.
 

Back
Top