Here's a couple of bouquets and brickbats to the City's pathway team regarding closures and detours:
Bouquet -- there are temporary pathways for some longer-term works; the Eau Claire bridge in particular. There's new asphalt in Sien Lok Park, and then a real cycle detour continuing on Riverfront Avenue -- last year, this was signed as a cycle detour during the summer (to get cyclists out of the Eau Claire area for more distancing) but it was de facto a parking lane; this year, there are rubber curbs and plastic posts. Even more interesting is this on Prince's Island:
A temporary multi-use pathway on the grass. It could be wider, but slowing everybody down here is probably a good thing.
Brickbats:
The first is the detour at the 5th St underpass; this photo is from a few days ago, but the signage has been the same for a month:
Cyclists are told to ride on the sidewalk, even though there is a cycle lane detour taking up a street lane. The first time I rode through here and saw this sign was before the Labour Day long weekend; the east sidewalk I was sent to was fenced in! I was literally so confused, I got off my bike, walked it across the street, realized that was the west sidewalk, saw the on-road cycling detour, walked back across. It was baffling. It's been there for a month, wrong continuously, and still it sits.
Also brickbat:
The online pathway map showing closures. It's a good idea; there's lots of closures and temporary work, and it's good to show people where they are. But looking at the site, it's amazing; you can see the past, present and future all at the same time. The pathway through the Elbow Camp on the Stampede grounds is shown as closed -- that was for an event in August. The pathway under Macleod to the Stampede is closed - that was for LRT construction that ended over a week ago. The pathways are closed under the 5th St flyover, across the Jaipur Bridge, 9A St for Bow to Bluff, 9th Ave to Inglewood -- sure, those are all actual pathway closures. Meanwhile, there's a cycle track shown along 12th Ave all the way to the CP rail at 19 St SW -- not today, as Chealion posted above; the area is under construction and cycling isn't allowed through there but no sign of that. Same thing (I think) on 3rd Ave S -- it's scheduled for construction until October, but it shows as an unimpeded cycle track today.
The two worst parts are that 1) looking at a closure to see if it's in the past or future requires clicking on a tiny logo -- it works okay on my computer, but on my phone (you know, the thing I have with me on my bike) I need to click the exact right pixel to get the detour info to pop up. and 2). the closures that are in the past have dates on the website showing they are in the past; surely the cumulative computing horsepower of the City of Calgary is capable of working out the difficult calculus of whether a detour from September 7th to September 16th is in effect or not on September 25.