Developer: Embassy Bosa, RioCan REIT
Architect: Amanat Architect, Gibbs Gage Architects
  
Address: 428 6th Street SE, Calgary
Category: Residential, Commercial (Retail)
Status: CompleteCompletion: TBD
Height: 466 ft / 142.03 mStoreys: 42 storeys
Project Forum 1.6K posts
Real Estate Forum
Follow 9 followingUpload 728 photos
Official WebsiteReport Error


Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

General rating of the project

  • Great

    Votes: 9 9.6%
  • Very good

    Votes: 45 47.9%
  • Good

    Votes: 29 30.9%
  • So So

    Votes: 7 7.4%
  • Not Very Good

    Votes: 3 3.2%
  • Terrible

    Votes: 1 1.1%

  • Total voters
    94
Final Crane bump took place this weekend.
Slab 36 was poured last Monday the third tie back is on Level 35. verticals for Level 36 will start tomorrow (Monday). L37 is a bit of a transfer slab as the floor plate changes for L37-39 and then again for L40-41
Windows are on L30.
unfortunately I'm currently not on the site right now so hard to get too many details, but final occupied floor remains at L41 there is a L42 roof slab and mechanical penthouse with Parapet peak making up a "L43"
 