Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

General rating of the project

  • Great

    Votes: 9 9.6%
  • Very good

    Votes: 45 47.9%
  • Good

    Votes: 29 30.9%
  • So So

    Votes: 7 7.4%
  • Not Very Good

    Votes: 3 3.2%
  • Terrible

    Votes: 1 1.1%

  • Total voters
    94
omg haha I took that exact same pic (first one) yesterday!

6D2C0A50-1B1D-4270-8635-BDAFFAC728A3.jpeg
 
Why has it stayed the same for months??
it hasn't stayed the same for months... look at the photo updates.
Window install and deliveries have been delayed due to re-shoring needed for the heavy transfer and roof slabs
I have pictures myself from 37 and then 42(roof) only 7 weeks apart, it did slow down as they got into floor plate changes.
As they were going up the typical floors were a 6 day cycle.
There was a concrete shortage last week for the roof slab pour as well which delayed them a few days
 

Back
Top