AHC 6th Ave | 25m | 6s | Attainable Homes Calgary | Hindle Architects

If they stacked the modular units shortly after that, without adding the elevator and stairwells up to 6 storeys prior to the modular units being placed, how are they doing the stairswells and elevator shafts after the modular units are erected. Interested in how this works
 

Back
Top