News   Apr 03, 2020
 5.7K     1 
News   Apr 02, 2020
 7.4K     3 
News   Apr 02, 2020
 4.4K     0 

Search results

  1. T

    Meredith at Edmonton Trail | 14.63m | 4s | Gravity Architecture

    The building is up for sale. According to the video, there is a new restaurant going in one of the commercial spaces. https://www.realtor.ca/real-estate/27722144/201203205-65-edmonton-trail-ne-calgary-bridgelandriverside
  2. T

    Infill Development Discussion

    New infill development in Mount Pleasant https://dmap.calgary.ca/?p=DP2024-07776 2 SFHs replaced with 6 units up and 6 basement units. I've already received a mailer from a concerned neighbour espousing the end of the neighbourhood. I don't think I've seen one of these mid block like this in...
  3. T

    Gallery First & Tenth | 60m | 19s | Truman

    They saved a 3 foot long sandstone block with a sign above that talks about Penny Lane and some images. It's on the +15 level as you exit to the South. Completely forgettable.
  4. T

    The Loft | 44m | 11s | Institutional Mortgage Capital

    Such an odd building to begin with. The office market must have been crazy at the time this was built, the floor plate is tiny. Clearly no one wanted the office space now. Residential conversion is a great use for an odd "office" building and the location is pretty good for access to Kensington...
  5. T

    The Barron | 43m | 11s | Strategic Group | Gibbs Gage

    Work has resumed!
  6. T

    Urban Development and Proposals Discussion

    That's a good addition to 16th. That site must have some significant soil contamination from the old Rosedale cleaners which was on that site pre 16th ave refurb (judging by the pipe farm there now).
  7. T

    Sydney | 21m | 6s | Morrison Homes | NORR

    That's a good addition to 16th. That site must have some significant soil contamination from the old Rosedale cleaners which was on that site pre 16th ave refurb (judging by the pipe farm there now).
  8. T

    Lincoln | 120m | 37s | Truman | NORR

    I walk by almost daily and there have been construction vehicles parked there most days since Imperia started up. My guess is they are just cleaning up the site to use this as a yard for Imperia. I wouldn't expect Truman to go full out with simultaneous construction of two high-rises, but I...
  9. T

    General Construction Updates

    I have a feeling that the property owner is removing the building to save on insurance and security costs. A vacant building is an attractive spot for someone to break in and setup camp in. Same thing happened with that old gym around the corner on 12th Ave, and I expect Lacey court to be the...
  10. T

    Calgary International Airport

    As an aside, every time I see those tables I cringe at the formula and formatting errors in the international table. That's sloppy work and I have no time for that.
  11. T

    General Construction Updates

    Yep, got to keep that path connection closed. Looks very unsafe eyeroll.gif
  12. T

    Urban Development and Proposals Discussion

    Anecdotally, I stopped using the bike storage in my building in the beltline. I always had a habit of making my bike the most difficult to steal but thefts became a weekly thing and I just brought it up to my unit.
  13. T

    Imperia | 95.3m | 27s | Truman | NORR

    Drill onsite this morning
  14. T

    Urban Development and Proposals Discussion

    This older apartment building is undergoing some exterior renovations 411 14 ST NW https://dmap.calgary.ca/?p=DP2024-03544 Looks to be adding some CRUs and some landscaping. I wonder if the entire building is getting an exterior refresh? It has definitely seen better days.
  15. T

    Imperia | 95.3m | 27s | Truman | NORR

    From what I can tell, they are removing parts of the old foundation so that they can begin shoring. Similar to what happened across the street after the building on 12th and 4th was taken down.
  16. T

    526 - 4th Ave | 112m | 32s | LaCaille Group | S2

    Caesars included? If so, that's a shame as its definitely a classic Calgary institution. Restaurant interiors aren't built like that anymore.
  17. T

    General Construction Updates

    Nice, Calgary was missing a Kenny Rogers Roaster
  18. T

    General Construction Updates

    Splash park is no more, it was replaced with some other type of playground for "all ages". I really wish that they would at least open up the path from the Sheraton to the Jaipur bridge, but that's a no for cited safety concerns. I have a hard time believing that they aren't able to open up...
  19. T

    Hampton Inn by Hilton | 56.08m | 17s | Triple One | NORR

    Cool to see an all steel constructed highrise downtown. I'm sure there are others but off the top of my head its just the Bow and Elevden Centre.
  20. T

    Place 800 | 68m | 17s | Peoplefirst

    I'm probably in the minority here but I don't hate it. It's sure better than the current form of beige box. To me it looks like they're trying to tie the design of the +15 in to the building. Side note, is this the first residential conversion with a +15 connection? It's a pretty key piece...

Back
Top