News   Apr 03, 2020
 1.6K     0 
News   Apr 02, 2020
 3K     3 
News   Apr 02, 2020
 1.4K     0 

Recent content by luk_o

  1. luk_o

    Place 10 | 121m | 35s | Centron | Gibbs Gage

    lol..I think we may work in the same tower(s) GoVertical.
  2. luk_o

    Place 10 | 121m | 35s | Centron | Gibbs Gage

    2 minutes ago. Looking good!
  3. luk_o

    Place 10 | 121m | 35s | Centron | Gibbs Gage

    Tough to see with my low quality phone pic, but some decent activity up there this morning. Quite a few workers, inspections and prepping of the rebar happening 👍
  4. luk_o

    RNDSQR Block | 45m | 12s | RNDSQR | 5468796 Architecture

    Beautiful. Shovels in ground!
  5. luk_o

    Calgary | Arris - 5th and Third | 142m | 41s | Embassy Bosa | Amanat Architect

    Ha. No, typo. Accurate though ?
  6. luk_o

    Calgary | Arris - 5th and Third | 142m | 41s | Embassy Bosa | Amanat Architect

    I worked blocks away from the Keynote one for years as well and I'd share that same sediment.
  7. luk_o

    South Bank | 18.3m | 5s | Opus Corporation | Kasian

    Ya, still not sure about the weathered steel component either...mixing in the perforated ones, especially the excessive cluster of them around the windows at the back seems a bit tacky or unnecessary...or something. I need to sit on a lawn chair and stare at for a while with a six pack of PBR to...
  8. luk_o

    Calgary | The Hub | ?m | 28s | Campus Suites | ARK Inc.

    No better way to describe it. A massive embarrassment that stands out from all directions. Makes me swear to myself in the car everytime I drive pass it.
  9. luk_o

    Urban Development and Proposals Discussion

    Just NO. Don't mess with the few blocks that actually contribute to 4th. Very much against this. So many other locations in the Beltline that deserve the wrecking ball over this.
  10. luk_o

    Calgary | Arris - 5th and Third | 142m | 41s | Embassy Bosa | Amanat Architect

    2020-05-12 Splash of white marble to the mix? Why the hell not.
  11. luk_o

    Reclads

    2020-05-12 Was very pessimistic of this one at render stage, but it's turning out fine.
  12. luk_o

    Calgary | Arris - 5th and Third | 142m | 41s | Embassy Bosa | Amanat Architect

    Anyone know if the rest of the (currently) uncladded twisty concrete columns are going to get the same cladding treatment as the ones in the SW corner?
  13. luk_o

    Calgary | The Bridge | 52.42m | 16s | Jemm Properties | Zeidler

    Loads of activity there this afternoon.

Top